Welcome!
We'd like to make your visit as useful as possible. Please tell us your role so we can offer you the most relevant information on future visits. (This is the only time we'll ask you!)
Please select a role below:
No Thanks      
Thanks!
Please help us expand this feature by telling us your role.
(optional)
No Thanks      

Seismic Installation for Contractors


Product Type
Ceilings Walls Suspension Systems Trims & Transitions Building Perimeter Systems Drywall Grid Systems

Chat Live

Seismic > Seismic Installation Requirements for Contractors  

IBC SEISMIC INSTALLATION REQUIREMENTS
IBC
CATEGORY

IBC INSTALLATION REQUIREMENTS

A,B

Ceiling installation should conform to basic minimums established in ASTM C 636.


C

To be installed to CISCA recommendations for areas subject to light to moderate seismic activity.

  • Minimum 7/8″ wall molding
  • Grid must not be attached to the wall molding
  • Minimum 3/8″ clearance on all sides
  • Minimum 3/8″ overlap of grid on the wall molding
  • Ends of main beams and cross tees must be tied together to prevent their spreading
  • Safety wires required on light fixtures

NOTE: Requirements for essential use facilities may be different.
Contact TechLine for details.


D,E,F

Installation must conform to CISCA recommendations for areas subject to severe seismic activity.

IBC categories D, E and F must also meet these additional requirements:

  • Minimum 2″ wall molding
  • Grid must be attached to two adjacent walls –opposite walls must have a 3/4″ clearance
  • Ends of main beams and cross tees must be tied together to prevent their spreading
  • Heavy-duty grid system
  • Ceiling areas over 1,000 SF must have horizontal restraint wire or rigid bracing
  • Ceiling areas over 2,500 SF must have seismic separation joints or full height partitions
  • Ceilings without rigid bracing must have 2″ oversized trim rings for sprinklers and other penetrations
  • Changes in ceiling plane must have positive bracing
  • Cable trays and electrical conduits must be independently supported and braced
  • Suspended ceilings will be subject to special inspection
  • Perimeter support wires within 8"

NOTE: Consult your local code professional for information specific to your region. California projects may be governed by DSA and OSHPD.

 

PLEASE NOTE

Please provide a properly formatted email address. (example: email@company.com)
My Armstrong | View Cart
Change Country | Français Canada
Search
COMMERCIAL CEILINGS & WALLS | USA & Canada