 |
Case Study - Indoor Environment Quality
| |
DESIGN & ACOUSTICS
|
 Enlarge |
|
Challenge How to reduce excess reverberation and noise build up in a loud canteen. With its 3.50 metre high ceiling and rough concrete
finish, conversations were difficult and students were stressed.
Solution Armstrong proposed a fast, clean and simple solution to address these challenges. This included ULTIMA CANOPIES over the more
acoustically challenged area’s – approximately 30% of the ceiling – ensuring extra sound absorption. And to increase the attractiveness
of the canteen, INFUSIONS CANOPIES were used in the design to add colour over a 60 m² adjacent space.
|
|